Contract between DMT and ECOCEM
7 april 2017 :
DMT signs an exclusive contract with Ecocem for the use of three of the four silos set up by DMT, to store ground slag before loading a boat. This one is loaded via pipes which allows the material to be transported from the silos to the boat.